Step 1

Cutting Wood Boards

Based on the product item that client orders, cutting MDF boards or solid wood boards into different shape pieces by the professional machine.

  • Production Process-Step 1-Cutting Wood Boards-1 | Zoser
  • Production Process-Step 1-Cutting Wood Boards-2 | Zoser
  • Production Process-Step 1-Cutting Wood Boards-3 | Zoser
  • Production Process-Step 1-Cutting Wood Boards-4 | Zoser

  • Production Process-Step 1-Cutting Wood Boards-1 | Zoser

  • Production Process-Step 2-Punching Hole-1 | Zoser

Step 2

Punching Holes

On the certain positions of cut wood pieces, punching holes for watch winder’s controller & watch winder, watch box, jewelry box and glasses box’s hinges.

  • Production Process-Step 2-Punching Hole-1 | Zoser
  • Production Process-Step 2-Punching Hole-2 | Zoser

Step 3

Assembling

Assembling wood pieces with holes to the product shape with the white latex. Fix the shape by rubber rings until it is completely dry.

  • Production Process-Step 3-Assembling-1 | Zoser
  • Production Process-Step 3-Assembling-2 | Zoser
  • Production Process-Step 3-Assembling-3 | Zoser
  • Production Process-Step 3-Assembling-4 | Zoser

  • Production Process-Step 3-Assembling-1 | Zoser

  • Production Process-Step 4-1st Polishing & Undercoat Painting-1 | Zoser

Step 4

1st Polishing & Undercoat Painting(2 times)

Polishing the wood shape by hand with the professional machine then painting the undercoat on the entire surface, repeat polishing and painting.

  • Production Process-Step 4-1st Polishing & Undercoat Painting-1 | Zoser

Step 5

Sticking Wood-Grained Paper

According to the product’s exterior color the client requests, sticking the wood-grained paper on the wood shape with the special glue.

  • Production Process-Step 5-Sticking Wood-Grained Paper-1 | Zoser
  • Production Process-Step 5-Sticking Wood-Grained Paper-2 | Zoser
  • Production Process-Step 5-Sticking Wood-Grained Paper-3 | Zoser

  • Production Process-Step 5-Sticking Wood-Grained Paper-1 | Zoser

  • Production Process-Step 6-2nd Polishing & Undercoat Painting-1 | Zoser

Step 6

2nd Polishing & Undercoat Painting(2 times)

Polishing the wood shape with the wood-grained paper then painting the undercoat on the cover by hand. When the painting is dry, do it again.

  • Production Process-Step 6-2nd Polishing & Undercoat Painting-1 | Zoser
  • Production Process-Step 6-2nd Polishing & Undercoat Painting-2 | Zoser
  • Production Process-Step 6-2nd Polishing & Undercoat Painting-3 | Zoser
  • Production Process-Step 6-2nd Polishing & Undercoat Painting-4 | Zoser

Step 7

Top Painting(4 times)

According to the client’s order, do the topcoat color painting by hand. After dry, polishing and painting again. Repeat the step for 3 more times!

  • Production Process-Step 7-Top Painting-1 | Zoser
  • Production Process-Step 7-Top Painting-2 | Zoser
  • Production Process-Step 7-Top Painting-3 | Zoser
  • Production Process-Step 7-Top Painting-4 | Zoser

  • Production Process-Step 7-Top Painting-1 | Zoser

  • Production Process-Step 8-Top Polishing-1 | Zoser

Step 8

Top Polishing

Polishing the painted product wood shape by hand with the professional machine for two times. Make sure it is high gloss painting finished.

  • Production Process-Step 8-Top Polishing-1 | Zoser
  • Production Process-Step 8-Top Polishing-2 | Zoser
  • Production Process-Step 8-Top Polishing-3 | Zoser
  • Production Process-Step 8-Top Polishing-4 | Zoser

Step 9

Installing Hinges

Installing the proper hinges, locks, screws and knobs in the painted and polished watch winder, watch box, jewelry box and glasses box shapes.

  • Production Process-Step 9-Installing Hinges-1 | Zoser
  • Production Process-Step 9-Installing Hinges-2 | Zoser
  • Production Process-Step 9-Installing Hinges-3 | Zoser
  • Production Process-Step 9-Installing Hinges-4 | Zoser

  • Production Process-Step 9-Installing Hinges-1 | Zoser

  • Production Process-Step 10-Installing Interior & Watch Winder Parts-1 | Zoser

Step 10

Installing Interior & Watch Winder Parts

Installing the leather or velvet interior in the product shapes. For watch winders only, installing the motors, controllers, PCB & turntable board.

  • Production Process-Step 10-Installing Interior & Watch Winder Parts-1 | Zoser
  • Production Process-Step 10-Installing Interior & Watch Winder Parts-2 | Zoser
  • Production Process-Step 10-Installing Interior & Watch Winder Parts-3 | Zoser
  • Production Process-Step 10-Installing Interior & Watch Winder Parts-4 | Zoser

Step 11

Inspecting

Completely cleaning the entire finished product, then inspecting every detail to ensure the whole product quality meets all our standards.

  • Production Process-Step 11-Inspecting-1 | Zoser
  • Production Process-Step 11-Inspecting-2 | Zoser

  • Production Process-Step 11-Inspecting-1 | Zoser

  • Production Process-Step 12-Packing-1 | Zoser

Step 12

Packing

Packing the qualified watch winder, watch box, jewelry box and glasses box product, with the cleaning-cloth, protection-bag, PE foam, inner box and export carton.

  • Production Process-Step 12-Packing-1 | Zoser
  • Production Process-Step 12-Packing-2 | Zoser
  • Production Process-Step 12-Packing-3 | Zoser
  • Production Process-Step 12-Packing-4 | Zoser

Want to Know More about Our Good Quality Products?

contact us now